Country-specific checklists

All construction phases covered

From due diligence to final handover — every step explained clearly

Showing phases for Romania · More countries coming soon

1

Land acquisition & due diligence

Check ownership, cadastral records, planning constraints, access, utilities and site risks before investing.

14 checks~30dRomania: verify the legal basis and transitional regime for the specific project
2

Planning certificate

Confirm what may be built, the planning limits and the approvals required by the local authority.

10 checks~30dRomania: verify the legal basis and transitional regime for the specific project
3

Design & approvals

Coordinate architecture, structure and building services, then obtain the approvals required for the permit.

17 checks~90dRomania: verify the legal basis and transitional regime for the specific project
4

Building permit

Prepare and submit the complete permit file and verify its validity before work starts.

10 checks~30dRomania: verify the legal basis and transitional regime for the specific project
5

Site setup & start of works

Appoint the project team, contract the builder and prepare the site, notices and safety documentation.

14 checks~14dRomania: verify the legal basis and transitional regime for the specific project
6

Foundations

Check setting-out, excavation, founding conditions, reinforcement, formwork, concrete and concealed work records.

18 checks~30dRomania: verify the legal basis and transitional regime for the specific project
7

Structure

Track structural work, mandatory inspections, material traceability and records before elements are concealed.

17 checks~90dRomania: verify the legal basis and transitional regime for the specific project
8

Envelope, roof & windows

Close and protect the building with compliant walls, roof, waterproofing, insulation and external joinery.

12 checks~60dRomania: verify the legal basis and transitional regime for the specific project
9

Building services — first fix

Install and test electrical, plumbing, heating, ventilation and gas systems before finishes conceal them.

15 checks~45dRomania: verify the legal basis and transitional regime for the specific project
10

Interior & exterior finishes

Check substrates, waterproofing, finishes, tolerances, compatibility and workmanship before acceptance.

16 checks~90dRomania: verify the legal basis and transitional regime for the specific project
11

Inspections & handover

Close nonconformities, complete the technical file and prepare the building for formal handover.

10 checks~14dRomania: verify the legal basis and transitional regime for the specific project
12

Registration & move-in

Complete the post-handover records, registration, utility and occupancy steps required locally.

10 checks~30dRomania: verify the legal basis and transitional regime for the specific project